Questions to Ask, and the Answer Kept

The hard part is not sending the message. It is knowing what to ask, and remembering what he said. When Dave answers, that sentence is a fact about the house — and filed as a chat bubble it is gone in a week.

A · What to ask, this week
Three questions, each one hanging off something that is actually open. Not a checklist and not a nag — if none of them is useful, none of them has to be asked.
B · He answered
The reply arrives as a message and is filed as an answer. One tap, and it is the coach that offers — you never have to know that a date needed catching.
Dave Marsh

Drywall

When does the drywall go up in the kitchen?

“Board goes up the week of the 2nd, so I need the cabinet color by the 28th at the latest. After that the painter is on a different house.”

Two things in that

A date you now have to hit, and a reason.

Keep them against the cabinet decision, and the kitchen stops being the room with the vague deadline.

Cabinet color, due 28 May.

Kept
Board goes up the week of 2 June Dave Marsh, 17 May · against Kitchen · cabinet package

It's still in the thread. It's also on the decision now, which is where somebody looks in three weeks.

C · Where the answer ends up
On the decision, beside the specification, in the same treatment as everything else that is settled. It stopped being a message the moment it was kept.
Kitchen

Cabinet package

Due 28 May Reed Millwork
What you have settled
ColorPewter Green, SW 6208
Door styleFlat panel, inset
HardwareStill open
What Dave told you
Drywall Week of 2 June
17 May
Color needed By 28 May, or the painter moves on
17 May

Nora hasn't seen the 28th yet. She is the one who wanted to look at the greens again in daylight.

D · What nobody asked, and should have
The delay named before it happens, hanging off a decision, which is the only place it can. Not the only real content on the page any more — frame A's questions turn out to have a real bank behind them too, just the wrong one (see the closing note).
Kitchen · cabinet package

If this one slips

Cabinets are built to order. Once you sign, the clock starts and it's six to ten weeks. And changing the color after that's a new order, not an amendment.

From the library, not from Dave. It's true of every cabinet package.

So the question is
If we sign the color on the 28th, when do they actually arrive? Six to ten weeks is a wide window and only he knows which end of it Reed Millwork is running at. Ask him

This one comes off a decision, and that isn't an accident

decision_library.delay_consequences is real and hangs off a decision. A delay named per phase would be content nobody has written and nowhere to store it.

A reply is an answer, not a message